Are you planning to install a kitchen and bedroom in your newly built property? The first question that will cross your mind is “How soon can you finish it?” The bedroom and kitchen are two important components of the property; hence, the homeowners are always in need of fast completion of these two parts of the house. The sooner the job is completed, the faster you can move into the house and start living in it.
However, proper coordination, layout, planning, installation, and precise design require time. The careful coordination can compromise the results and damage your new bedroom and kitchen.
For kitchen and bedroom installation in Norwich, get in touch with professional builders and installers. They can help you with a fast installation process.
The Timeline For the Bedroom and Kitchen Installation
The Planning Stage
Before the physical work begins, the planning stage will take time. This is the ideal time to sit down with your builder for a design consultation. Do you need an open kitchen? Do you need a large bedroom with a separate workspace? The builder will create the layout and design according to the client’s requirements. This stage takes time and after several changes, the final design is fixed.
Removal and Preparation Stage
Are you planning to replace the existing kitchen or the bedroom? Then, you need to remove the old fittings and fixtures. This process typically takes one to two days. Again, the plumbing and electrical wirings also needs to be removed before the new construction starts. Additionally, the wall repairs are completed before the new construction commences. The whole process will take more than a week. Preparation is essential as it makes the later process smooth.
Installation Timeline
The timelines for installing kitchens and bedrooms will be different. While kitchens will take one to three weeks for complete installation. Bedrooms will take less time compared to the kitchens. Bedroom installation will take three to seven days. If you have opted for a custom bedroom design, then it might take a few more days. Especially the installation of the built-in desks, shelves and lights will take some time.
Timeline for Finishing Touches
Once the major work has been completed, the finishing touches, including painting, sealing, installing handles and lights, and tiling, are left to be done. It can take a few more days. This stage is essential as it helps achieve a polished and high-quality look for both the bedroom and the kitchen.
What Factors Affects the Timeline of Bedroom and Kitchen Installation?
- The custom manufacturing process and installation of bespoke cabinets and worktops can impact the timeline of the installation process.
- If you make sudden changes to the design, the work will take longer to complete.
- If unexpected issues arise, such as structural problems in the property, the timeline will be adjusted accordingly.
- If there is a shortage in the availability of specialists, such as professional electricians and plasterers, then the work will be delayed.
For aesthetic and bespoke kitchen and bedroom installations, contact Nigel Stone. With immense experience in building kitchen units and bedroom sets for homes, you can rely on Nigel’s expertise in design and installation for quality products.